P22A8 BMW Fault Code
Check P22A8 OBD Fault Code ReasonEngine Coolant Temperature (ECT) Circuit High Input Indicates the sensor signal is greater than Self-Test maximum. The ECT sensor maximum is 4.6 volts or -50 C (-58 F). Note on some vehicles that are not equipped with an ECT sensor, CHT can be used and can set this DTC. Open circuit in harness Sensor signal short to power Damaged PCM Improper harness connection Damaged sensor ECT V PID reading greater than 4.6 volts with key ON and engine OFF or during any engine operating mode indicates a hard fault.
P22A8 Code Symptoms :
The scent may P22A8 signal oil or coolant leaking from their normally closed-loop systems, or it may indicate dangerous exhaust gases invading your car's interior. Car and truck exhaust contains toxic gases such P22A8, so if the inside of your car as if you were standing behind your car, get out and get it fixed.
Fight the urge to take a little nap first. So sleepy. That's the carbon monoxide talking, friends. At least open a window on your way to the shop.
Diagnosis And Repairing P22A8
P22A8 the main thing to check is to verify the operation of the VCT solenoid. You're looking for a sticking or stuck VCt solenoid valve caused by contamination. Refer to vehicle specific repair manual to perform component tests for the VCT unit.
How to fix P22A8 code ?
- Camshaft advance mechanism binding (VCT unit)
- Faulty TCM or TCM programming
- Camshaft advance mechanism binding (VCT unit)
- Loss of ground.
Circuit High Input codes like P22A8 are mostly caused by defective alternators that develop excessive voltages, although there may be other causes as well, such as short circuits that 'leak' current into a particular system from other, unrelated systems that work on higher voltages. Note that in the case of short circuits that leak power into a control circuit, there is likely to be other, seemingly unrelated trouble codes present along with the code(s) being investigated. Diagnosing a 'high input' code will always involve a thorough testing of the charging system as a first step, followed by measures to isolate the system from all other possible sources of power during resistance, continuity, and reference voltage tests.